River cleanup an economic plus
Concerning the Ottawa River cleanup plan: The dredging project on the upper reaches of the Ottawa River, between Stickney and Suder avenues, is already in place and is set to begin this coming spring.
Approximately 257,000 cubic yards of contaminated sediments will be dredged and de-watered by placing the dredgings, which would contain contaminates, into large propylene bags. Discharge water would be treated before being allowed...
Full News Article
Approximately 257,000 cubic yards of contaminated sediments will be dredged and de-watered by placing the dredgings, which would contain contaminates, into large propylene bags. Discharge water would be treated before being allowed...
Full News Article
Комментарии